BC864
if extension of attachment position is needed, shaft can be jointed


Part No. | Color | ballφ | φd1(H8) | φD2 | F | C | E | |
---|---|---|---|---|---|---|---|---|
BC06- | 864 | W/B | φ6 | φ6 | φ13 | 8 | 22 | 7 |
BC08- | φ8 | φ8 | φ15 | 10 | 25 | 9 | ||
BC09- | φ9 | φ9 | 26 | 10 | ||||
BC10- | φ10 | φ10 | 11 | 29 | 11 | |||
BC12- | φ12 | φ12 | φ22 | 14 | 31 | 13 | ||
BC13- | φ13 | φ13 | 15 | 14 | ||||
BC15- | φ15 | φ15 | φ25 | 18 | 34 | |||
BC16- | φ16 | φ16 | 20 | |||||
BC19- | φ19.05 | φ19.1 | φ29 | 21.5 | 39 | 18 | ||
BC20- | φ20 | φ20 | 23 | |||||
BC25- | φ25 | φ25.1 | φ37 | 28.5 | 45.5 | 23 |
※You may download 3D CAD drawings by clicking on the part number of interest.
How to assemble
Joint-ball
Joint-ball
Steel plate, steel screw and spring are enclosed, if you purchase Joint-base.
Note
This will not be recovered if the slit part is expanded too much. Please make sure on your work.

- First of all, remove cap screw on slit side
- Screw the set screw from the opposite side. Please make sure the top of screw is not appeared within slit.
- As indicated on the above figure,insert and position steel plate(less than 0.9mm) and tighten lightly the cap screw with your other hand.
- Drop the attached spring into the center of the hole.
- Tighten the aforesaid cap screw by hexagon wrench so that slit part is opening. Push into joint-ball suitably orif not going through, tighten the cap screw a little and push again and repeatedly.
- If joint-ball is inserted, loosen the cap screw and remove the steel plate.
- Check if joint-ball can move smoothly and remove the cap screw afterward.
- Screw the cap screw (1.) into the original position (the opposite side) and finish.
We can assemble on behalf of you, if required