• 設計及び問い扱い説明書
  • ユニバーサルジョイントの選定手順
  • ご注文に際してのお願い

BC871

separate type. Later attachment allows convenience of parts attachment
cad
Part No. Color ballφ φd1(H8) φD2 F E G H
BC06- 871 W/B φ6 φ6 φ20 13.5 9.5 10 6
BC08- φ8 φ8 φ24 17.5 11.2 12 8
BC09- φ9 φ9 φ30 18.5 14.1 15 10
BC10- φ10 φ10
BC12- φ12 φ12 φ35 23.5 16.4 17.5 12
BC13- φ13 φ13 25.5 16.3 13
BC15- φ15 φ15 φ42 27.5 20 21 15
BC16- φ16 φ16 28.5 19.4 16
BC19- φ19.05 φ19.1 φ50 33.5 23.3 25 19
BC20- φ20 φ20 34.5 22.7 20
※You may download 3D CAD drawings by clicking on the part number of interest.
How to assemble
Joint-ball
Steel plate, steel screw and spring are enclosed, if you purchase Joint-base.
Note
This will not be recovered if the slit part is expanded too much. Please make sure on your work.
  • First of all, remove cap screw on slit side
  • Screw the set screw from the opposite side. Please make sure the top of screw is not appeared within slit.
  • As indicated on the above figure,insert and position steel plate(less than 0.9mm) and tighten lightly the cap screw with your other hand.
  • Drop the attached spring into the center of the hole.
  • Tighten the aforesaid cap screw by hexagon wrench so that slit part is opening. Push into joint-ball suitably orif not going through, tighten the cap screw a little and push again and repeatedly.
  • If joint-ball is inserted, loosen the cap screw and remove the steel plate.
  • Check if joint-ball can move smoothly and remove the cap screw afterward.
  • Screw the cap screw (1.) into the original position (the opposite side) and finish.
We can assemble on behalf of you, if required